Solutions:

Provided scrap/recycle dumpsters onsite. Installers/labor to break down all systems and load onto regularly scheduled trailers/trucks. Market the used furniture to potential buyers looking for "as is" or used office furniture. 

After

Challenges:

Move a company existing furniture on a very strict budget.  The layout will change and product will need to be added.  Match existing furniture as closely as possible. 

 

After

After

United 4 Children 

CIGNA 

Solutions:

Use a small crew to drop, and label the furnit for moving crew to move over to new facility.  Have new product made before the move to make sure install goes smoothly.  Moving company to stage furniture for easy and successful install.  Use same small crew to install the furniture that was moved. 

After

Results: 

The move was a success.  The moving company did a great job with the placement of the furniture.  The install went together without any issues.  The new product looked great with the existing furniture. Company stayed on budget and had a very successful move.

Before

Before

Results: 

 All contents were removed from the building within our target date. We sold a large portion of contents from site, shipping directly to the customer and recycling items that were no longer able to be used or resold. The end result provided a move in ready facility free of all previous contents, affordable used furniture for other customers and a green option to keep large quantities of furniture out of the landfills. In addition, our client was happy with our service, efficiency of the project and potential for long term repeat business in the future.

Before

Before

Case Studies

Challenges:

Cigna had relocated one of its offices and was in need of removing all office furniture from the building. This location had three large floors of office cubicles containing over 500 stations plus several conference rooms, training rooms and storage areas.